Year 2019 Service Preparation of accompanying technical and tender-specific explanations for timber construction according to LG 36 within the framework of the standard performance specification for building construction (LB-HB V.021) Status completed
Year 2019 Service Establishment of systematic system analyses for process optimization in executing timber construction companies Status ongoing
Year 2019 Service Accompanying consideration of the construction process sequences for costing analysis of timber construction as preparation for costing process comparisons of future projects Status completed
Year 2019 Service Comprehensive analysis of the multi-storey timber housing in Austria from a real estate economic point of view for the derivation and adaptation of specific valuation systems and key figures in the context of classical real estate valuation. Status completed
Year 2019 Service Accompanying consulting in the context of the building system development woodrocks for component optimization and construction process redesign for future timber construction projects Status completed
Year 2019 Performance Overall evaluation, interim status analysis and performance report of the scientific achievements and teaching and research areas of the Faculty of Civil Engineering as part of the overall evaluation process of Graz University of Technology. Status completed
Year 2019 Performance Market analysis and system analysis of the entire value chain of the Austrian timber industry for the overall presentation of Austrian timber construction abroad Status completed
Year 2018 Service Preparation and adaptation of generally applicable performance and remuneration models (LM.VM.2014) with specifications specific to timber construction and special features for the planning and construction supervision of timber structures Status ongoing
Year 2018 Service Analysis of the assembly and logistics processes of the timber construction at the building project HoHo (Vienna-Aspern) for the derivation of effort and performance values for the large-volume timber high-rise construction (wall elements, ceiling elements, columns and beams) Status completed
Year 2018 Service Cost analysis of different ceiling constructions, economic comparison of variants of different HBV-ceiling systems and total flooring systems due to structural and static modularity. Status completed