General

Industry positions BSP, BSH, ribbed panels | Ybbs, Bad St. Leonhard

Year 2020 Service Preparation of comprehensive industry positions / tendering texts for wall and ceiling elements made of wood – BSP wall/ceiling elements, BSH ceiling elements and ribbed slab ceilings within the framework of the Austrian industry standard together with ABK for the tendering of BSP and BSH in addition to LG 36 (according to […]

Industry positions MMK – XC HBV Ceiling Systems | AT

Year 2020 Service Preparation of comprehensive industry positions / tendering etxes for wood-concrete composite floors within the Austrian industry standard together with ABK for the tendering of HBV floor elements in addition to LG 36 (according to LB-HB V.021) Status completed

Real estate valuation in multi-storey wooden housing | AT

Year 2019 Service Comprehensive analysis of the multi-storey timber housing in Austria from a real estate economic point of view for the derivation and adaptation of specific valuation systems and key figures in the context of classical real estate valuation. Status completed

Evaluation Faculty Civil Engineering | Graz

Year 2019 Performance Overall evaluation, interim status analysis and performance report of the scientific achievements and teaching and research areas of the Faculty of Civil Engineering as part of the overall evaluation process of Graz University of Technology. Status completed

Construction Process Analysis Wooden High-Rise HoHo | Vienna

Year 2018 Service Analysis of the assembly and logistics processes of the timber construction at the building project HoHo (Vienna-Aspern) for the derivation of effort and performance values for the large-volume timber high-rise construction (wall elements, ceiling elements, columns and beams) Status completed